欧美xxxxx高潮喷水麻豆-欧美xxxxx精-欧美xxxx黑人又粗又长精品-欧美xxxx色视频在线观看-欧美xxxx性bbbbb喷水-欧美xxxx做受

7*24Hours for you

15967710202/0577-65336533

company newsCurrent Pocation:homecompany news

What are the requirements of polyurethane foaming machine for polyurethane base

As polyurethane contains strong polar carbamate groups, it can be divided into two types according to its molecular structure: linear type and body type. Due to the different cross-linking density, the structure can be hard, soft or between the two properties, with high strength, high wear resistance and solvent resistance. So what are the basic requirements of polyurethane foaming machine for polyurethane?

1. All pipe fittings, sanitary equipment, floor drain or water outlet must be installed firmly, with tight joints and round end, without any loose phenomenon.

2. Before construction, remove the protrusions, mortar bumps and other foreign matters on the surface of the base layer with spade knife and broom, and thoroughly clean the dirt and sundries. For Yin and Yang Angle, pipe root, floor drain and drain mouth and other parts should be carefully cleaned, such as found oil, rust, to use wire brush


3. The waterproof base of polyurethane shall be wiped with 1:3 cement mortar to make 1/50 flood slope according to the design requirements, and its surface shall be smoothed and compressed, and uneven, loose, sand-removing and other defects shall not be allowed. Drains or floor drains should be lower than the entire waterproof layer, in order to remove water. The pipe position with casing should be more than 20mm above the base surface. The Angle of Yin and Yang should be made into a small round corner with a radius of 10mm, so as to facilitate the coating construction.

4. The construction, in construction of traditional polyurethane waterproof coating, waterproof base should be basic in dry state, it is advisable to moisture content is less than 9%, the simple determination method is the area of 1 ㎡, thickness of 1.5 ~ 2.0 mm rubber cover on the base, place 2 ~ 3 hours, such as the coverage of the surface of the base without the watermark, close to the primary side rubber sheet and no condensation watermark, according to the experience shows that the moisture content is less than 9%, conform to the requirements of the construction.


主站蜘蛛池模板: 91色站 | 国产91影院| 精品无码国产自产拍在线观看蜜 | 亚洲va欧美va国产va综合 | 在线日本视频一区二区 | 亚洲91av视频在线观看 | 九九热在线视频观看这里只有精品 | 国产精品高潮呻吟久 | 亚洲精品秘一区二区三区 | 婷婷综合另类小说色区 | 国产精品偷伦视频免费观看了 | av一道无码字幕 | 亚洲日韩精品欧美一区二区一 | 亚洲一区av无码少妇电影 | 国产美女爆乳呻吟视频 | 欧美又粗又大又爽又色片 | 亚洲日韩av无码一区二区三区 | 国产制服丝袜在线无码 | 91av在线免费观看 | 日韩国产亚洲欧美成人图片 | 亚洲国产精品无码久久电影 | 国产ae| 精品国产电影网久久久久婷婷 | 国产亚洲精品va在线 | 欧美成人精品第一区 | 国产亚洲性色av大片久久香蕉 | 欧美午夜精 | 国产99视 | 日韩av高清无码 | 精品久久免费观看 | 91精品免费久 | 日本一区二区三区在线观看网站 | 无码人妻一区二区三区免水牛视 | 国产午夜精品一区二区三区四区 | 91国产天堂网 | 国自产拍偷拍精品啪啪模特 | 红掌文学网| 婷婷六月综合缴情在线小蛇 | 成人高清图片素材免费下载 | 国产精品不卡在线观看的a 国产精品厕所电影 | 亚洲一级av |